Does conduit need to go inside the transformer box?
No. Conduit should be stopped just short of the box.
-
Is additional conduit required beyond what is installed in the ditch?
If the service is being supplied from a utility pole, the member is required to supply 1-10 section of SCH 80 PVC and 2-10 sections of SCH 40 PVC to be left near the base of the pole for installation by the power company up the pole.
-
Does someone need to inspect the ditch before covering the conduit?
Yes, contact the power company and a representative will come and inspect the ditch and conduit. The representative will place a white sticker on the meter panel with a pass or fail notice.
-
Can permanent service be installed if the house has had a ruff in inspection?
No, We will not set a meter without a final inspection or in some instances a non occupancy permit shall be allowed from the local electrical inspector.
-
How close to the pole do I bring my conduit to?
The top of the elbow must be 6" from the pole..